2.3
Table Of Contents
- Title Page
- Contents
- Using This Guide
- Avid Software and Hardware Install Checklist
- Avid ISIS 7000 System Overview
- Connecting the ISIS Equipment
- Installing Software and Configuring 10-Gb Link Aggregation
- IP Addressing Overview
- Configuration Overview
- Software Installation
- Loading the Software
- Installing the Application Key
- Creating a Active partition on the System Director
- Installing Software on the Engines
- Engine Does Not Appear in Add Chassis List
- Check Switch IP Address
- Java Runtime Environment
- Loading Client Software
- Installing Macintosh Client Software Using Safari
- Loading and Configuring Client software for Zone 3 Clients
- Avid Interplay Authentication
- Configuring a 10-Gb Link Aggregation Group
- Configuring the System for Failover
- Status LEDs and Stacking Problems
- Avid ISIS 7000 Upgrade Guidelines
- Health Check
- Software Upgrade
- Post Upgrade System Verification
- Preupgrade Information
- Avid ISIS Upgrade Utility
- Configuring Switch Redundancy for Workgroup Servers
- Avid ISIS Recommended Maintenance
- Adding and Replacing Hardware
- Using the Product Recovery DVD for 64-bit System Directors
- Safety and Regulatory Information
- Warnings and Cautions
- FCC Notice
- Canadian Notice (Avis Canadien)
- LED Safety Notices
- European Union Declaration of Conformity
- Disposal of Waste Equipment by Users in the European Union
- Argentina Conformity
- Australia and New Zealand EMC Regulations
- Japan EMC Regulations
- Korean EMC Regulations
- Taiwan EMC Regulations
- Index
Weekly Maintenance
159
Weekly Maintenance
The following contains a list of items you should do on a weekly basis. It is estimated to take
30 minutes to perform these functions.
• Review Windows Event logs on the Active and Standby System Directors
• Check the ISB network connections between the ISBs using the ISB Connection
Analyzer. All Storage Elements should be green.
• In the Avid ISIS Switch Blade Agent, run the Switch Infrastructure Diagnostics located
in the Advanced tab. Select all tests, both the left and right networks, and all chassis.
n
Do not run the switch diagnostics during heavy usage or critical network production times.
Some tests burden the system’s bandwidth and resources.
In the results page, save the diagnostic results by clicking the Download link and save the
file using the date as part of the file name.
• Check the RAID status on the System Director.
- On the SR 2500, click Start > Programs > RAID Web Console 2 > Start UI and see
that the Server Heath is green. If not, search www.Intel.com and search for Intel
®
RAID Software User’s Guide for corrective actions.
- On the SR 2400 use the CIM Browser utility icon on the right-side of the taskbar.
The CIM Browser icon must be green (looks like a square). You can hover your
mouse pointer over the icon to see the utility name, double-click the icon to start the
utility.
• Make sure you have at least one storage element worth of free space (depending on the
size of your storage blades) for each storage group, see “Minimum Storage Space
Requirement” on page 157. If a storage blade should fail, you need enough space to
remove the failed storage blade.