Operator`s manual

LTW 20Z Operation
wc_tx001058gb.fm 35
Procedure
Follow the procedure below to raise the tower.
Lifting the
tower to the
vertical
position
1. Remove the cradle locking pin (j) from the cradle.
2. Check the operation of the tilt winch (o) by rotaing the winch handle 1/4 turn
clockwise (“cable in” direction). The winch pawl must engage the winch gear
teeth. When operating properly, the winch pawl will make a “clicking” sound
when the winch handle is rotated clockwise.
NOTICE: Do not attempt to lift the tower if the winch is damaged or not operating
properly, or if the winch cables are worn or damaged.
3. Continue to rotate the winch handle and lift the tower to the vertical position until
the vertical tower locking pin (p) locks the tower in place. Be certain the vertical
tower locking pin is fully engaged in the locking position before raising the tower.
Raising the
tower
4. After the tower is vertical, check the operation of the telescoping winch (q) by
rotating the winch handle 1/4 turn clockwise (“cable in” direction). The winch
pawl must engage the winch gear teeth. When operating properly, the winch
pawl will make a “clicking” sound when the winch handle is rotated clockwise.
NOTICE: Do not attempt to raise the tower if the winch is damaged or not operat-
ing properly, or if the winch cables are worn or damaged.
5. Continue rotating the winch handle until the tower is at the desired height. Do
not overcrank the winch when the tower is fully extended.
Rotating the
tower
Once the tower is at the desired height, rotate the tower to the desired direction.
1. Loosen the rotation locking knob (s).
2. Rotate the tower until the lights face the desired direction.
3. Retighten the rotation locking knob.