User's Manual

46
Vaccines for Children |
Installation and Setup Guide
change needs to be applied sooner than the set interval, power cycle the Display by
removing the batteries and then replacing them. When the Display powers back on, it
will take on the current settings.
4.3.8.2 Placing the Device on a Map
In the absence of BLE beacons for a non-MSE deployment, tag and VFC display
placement are done through System Manager by placing the devices on a map during
installation. Perform the following procedure to place the Tag and Display on a map:
1. In System Manager, click the Devices tab and then select Device Map.
A device region manager list displays.
2. Expand the list on the left to locate the floor where you will be placing the tag and
Display.
3. Click the floor.
The floor name will become bold in the list and the map of the floor displays.