User's Manual
Table Of Contents
- 1 Introduction
- 2 Installation Steps
- 3 Step #1 – Configure Regions
- 4 Step #2 – Preparing for Installation
- 5 Step #3 – Installing the Appliance
- 6 Step #4 – Installing the Bridge
- 7 Step #5 – Installing the Sensors
- 8 Step #6 – Installing the Tags
- 9 Step #7 – Associating the Tags with Assets
- 10 Step #8 – System Testing and Quality Control
- 11 Adding Additional Assets After Installation
- 12 Troubleshooting
Step #1 – Configure Regions 13
Installation Guide v2.3 – 5/10
Confidential and Proprietary ©2010, Awarepoint Corporation
Figure 19 - Valid Area
To complete the area, click on the starting point. The area will change color to blue
when the mouse is over the starting point.
Figure 20 - Complete Area
After you have completed the area, enter a name for the area.
Figure 21 - Naming the New Area
Note: Tags will only show up inside areas – you must draw area(s) on the floor where
Tags will travel.