Specifications

TEAM Climate Monitoring Protocol 3.0
42
6.4.3 Solar radiation (LI 200X)
The Licor LI 200X should be sent out for calibration every 2 years. As with the temperature
sensor, however, send out for calibration one of the duplicates at the end of the first year of
operation to keep two sensors always operating in alternate schedules (see section 6.4.1 and
Figure 13).
Follow these steps to replace the solar radiation sensor (you will need to fill in the Sensor
Calibration Form).
Disconnect the pyranometer from the data logger: Open the enclosure to get access to the
data logger and disconnect the four cables coming from the pyranometer into the data logger
(usually one into 3H (or 4H), one into 3L (or 3H) and two grounds).
Remove the pyranometer from the leveling base: Using the thin hex key (that comes with the
pyranometer), free the pyranometer from the leveling base. Write down the Serial Number
(below the Model label on one side) and the date on the Sensor Calibration Form.
Install the replacement: Locate the replacement pyranometer in its housing making sure that
the cable is routed through the slot on one side. Secure the pyranometer by tightening the hex
screw on the side of the base (using the thin hex key). REMOVE THE PLASTIC COVER
PROTECTING THE SENSOR (otherwise the data will be useless!).
Connect the pyranometer to the data logger: Route and secure the cable through the leveling
arm and base until it reaches the enclosure. Route through the enclosure making sure there is
enough slack to connect to the data logger. Connect the cables to the terminals where the
replaced-to-be pyranometer used to be (use the cabling diagram for your site to match the color
cables and terminals). Secure the cables inside the enclosure using a grommet and leaving
enough slack so they are not tense.
Check the Leveling Base: Make sure the new pyranometer is leveled by checking the bubble in
the leveling base. Adjust if necessary using the protruding screws on the leveling base.
Record the information and submit to the TEAM portal: Write down the serial number of the
new sensor and the date and time it was installed on the Sensor Calibration Form. Submit the
information to the TEAM portal as soon as technically feasible. See section 6.1.4 for
instructions on uploading the Sensor Calibration Form.
Sensor
Calibration process
Frequency
Temperature/RH Vaisala
HMP45C
Sent to manufacturer for calibration.
Fill in information on the Sensor Calibration Form
Submit information to the TEAM portal
Every two
years
1
Precipitation (TB4)
Level and pour 314 cc of water. Gauge should tip 39
times. If not send out for calibration
Fill in information on the Sensor Calibration Form
Yearly