Installation Guide

Please read the instructions fully before assembly.
This awning must be fully assembled prior to installing it onto
the wall.
STEP 1: Separate all of the parts by part number so they will be easy to assemble.
PARTS LIST
Size 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Top Bar - C Channel TB 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2
Front Bar FB 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4
Hypotenus / Cover Support CNC 2 2 2 3 3 3 4 4 5 5 5 5 5 7 7 7 7 7
Projection CNP 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Projection Assembly CNPA 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Back Bar CNB 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Projection Support CPS 2 2 2 3 3 3 4 4 5 5 5 5 5 7 7 7 7 7
Projection Bar Assembly CNPM 1 1 1 2 2 3 3 3 3 3 5 5 5 5 5
Additional Parts: Self Tapping Screws, Z-Brackets
Tools Required: Electrical Drill, ¼ Nut Driver Bit, Full Socket Set, Full set of Steel
and Masonry Bits, Tape Measure, Safety Glasses, 4’ Level, A Safe Ladder, #2 Pencil
YOU MAY ALSO NEED A HELPER DEPENDING ON THE SIZE, WEIGHT,
LENGTH AND HEIGHT OF THE AWNING
NOTE: YOU WILL FIND THAT THE FITTINGS HAVE BEEN PRE-INSTALLED,
AS WE HAVE PRE-ASSEMBLED AND INSPECTED IT FOR YOU IN THE
FACTORY.
ASSEMBLING THE FRAME
STEP 2: Connect Front Bar (FB) to (2) Back Bars (B). Make sure that the C-
Channel is away from you and close to the wall and also make sure that the Velcro
side of the Back Bar (B) is facing you
STEP 3: You may need a rubber mallet to fully seat the tubing onto the fittings.
STEP 4: Connect both Projection Bars (P) to other ends of the Back Bars (B) and
make sure that the Velcro on the Projection Bar (P) is facing you
STEP 5: Then connect the Front Bar (FB) to the Projection Bars (P) and make
sure that the Velcro is facing up
STEP 6: Connect the Projection Supports (CPS) to the Front Bar (FB)
STEP 7: Then connect the Top Front Bar (FB) the one with out the Velcro to the
top of the Projection Supports (PS) and then connect the Projection Assembly
(CNPA) to both Back Bar (CNB) and the Top Bar (TB)
STEP 8: Now install Hypotenuses (CNC) with arrows pointing upwards and
attach them to both ends of the Top Bar (TB) and Front Bar (FB)