Installation Guide

STEP 7: Additional parts Hypotenuse (NC) and Wall Supports or Projection Bar
Assembly (WS or PA) are provided for extra support
STEP 8: Install additional NC to complete the frame assembly
STEP 9: Wall Supports or Projection Bar Assembly (WS or PA) are installed
only if needed after the Awning is hung on the wall
INSTALLING THE COVER
STEP 10: Slide the bead at the top of the fabric into the C-Channel at the top of
(TB).
STEP 11: Pull the remainder of fabric over the frame with the valance hanging
down below the (NC) and (FB) bars.
STEP 12: Once you are satisfied with the position of the cover on the frame,
wrap the Velcro strips on the fabric tabs around the exterior bars. Pull the tabs
snugly and attach them to the pre-installed Velcro tape on the bars.
POSITIONING THE BRACKETS CORRECTLY ON THE WALL
*** all the sizes are in inches
Model
Space
between
TB and P
Height
incl
valance Projection Model
Space
between
TB and P Height Projection
RF22 24 31 24 RF22-NV 24 24 24
CF32 36 44 24 CF32-NV 36 36 24
CF33 36 44 36 CF33-NV 36 36 36
CF34 36 44 48 CF34-NV 36 36 48
CF43 48 56 36 CF43-NV 48 48 36
CF44 48 56 48 CF44-NV 48 48 48
EF2442 18 24 42 EF2442-NV 24 24 42
EF12 8 12 24 EF12-NV 12 12 24
EF1836 12 18 36 EF1836-NV 18 18 36
EF1230 8 12 30 EF1230-NV 12 12 30
EF1030 10 16 30 EF1030-NV 16 16 30
EF23 18 24 36 EF23-NV 24 24 36
EF24 18 24 48 EF24-NV 24 24 48
STEP 13: Place the awning on the wall and make adjustments to choose the ideal
location. Mark the bottom of the frame after you have centered it on the opening
that you are covering.
STEP 14: Using a pencil and a level, mark a horizontal line as wide as your
awning at that height. Verify that it is centered on the space.