Warranty
Page | 11
Figure F2: Attaching the Projection Bars to Front Bar
Step 8:Installing theShroud (Hood Cover) to the Surface
Parts you will need for a 3ft: 1 -(n) Shroud (Hood Cover), 4-(o) M8 or M6 Anchors, 4-(m) Nuts,
Drill, Level, Measuring Tape
Parts you will need for a 4ft: 1 -(n) Shroud (Hood Cover), 4-(o) M8 or M6 Anchors, 2-(m) Nuts,
Drill, Level, Measuring Tape
a) Carefully measure the distance between each mounting opening on the (n) Shroud (Hood Cover)
with measuring tape.
b) Still using the measuring tape, mark the same measurements of the mounting holes you
gathered from the (n) Shroud (Hood Cover) onto on the desired mounting surface with chalk.
Use a level as needed.
c) Drill pilot holes onto the specific markers. Refer to figure G1.
d) Line up the mounting holes with the holes on the (n) Shroud (Hood Cover). Put the (o) anchors
through each hole of the (n) Shroud (Hood Cover) and into the wall and make sure they are
snug.
Figure G1: Drill Pilot Holes into the Mounting Surface