User Manual

®
®
Assembly is EASY and offers wide-ranging configurations for your A/V equipment.
UNIVERSAL EQUIPMENT RK SERIES
ROLLING CABINET A/V RACKS
RK SERIES
WHEELS COME ALREADY INSTALLED FOR convenience.
Unpack all pieces. CAREFULLY DISCARD ALL PLASTIC
BAGS AWAY FROM CHILDREN AND PETS.
Depending on where you live, there are two options for rack
mounting screws (5mm North America and 6mm Europe).
The 5mm side is marked by the two slots on each of the
CORNER PILLARS.
Assemble the four CORNER PILLARS to the base first.
(Use the included screwdriver)
CORNER PILLARS can be installed 4 WAYS:
1. ALL (5mm) Holes facing out
2. ALL (6mm) Holes facing out
3. (6mm) Holes on the front and (5mm) Holes
in the back OR
4. (5mm) Holes on the front and (6mm) Holes
in the back
Remove all top screws from installed CORNER PILLARS.
Insert SIDE PANELS and tighten bottom screws in place.
Install TOP PLATE and tighten all remaining screws.
PLEASE PAY ATTENTION TO THESE DETAILS
FOR A STRAIGHTFORWARD INSTALLATION.
AxcessAbles RK Series Cabinets include a complimentary
AxcessAbles RKBLNK1U
Universal 1U Blank Rack Panel Spacer.
important notes:
1. corner pillars have two different sized threaded holes on each side.
2. make sure to use corresponding hole size with correct threaded screw size.
3. corner pillars can be installed using all 6mm side, all 5mm side or both.
4. corner pillars should be installed in unison.
Assembly
is
EASY
and
offers
wi
RK
22U
RK
16U
RK
12U
RK
8U

Summary of content (2 pages)