User Manual

ADCP-XX-XXX • November 2000 • Section 5: WMTS Operation
Page 5-1
2000, ADC Telecommunications, Inc.
SECTION 5: OPERATION
Content Page
1 INTRODUCTION ................................................................................................................................................1
2 PRE-OPERATIONAL CHECKS..........................................................................................................................1
2.1 Procedures............................................................................................................................................1
2.1.1 Test Equipment.......................................................................................................................2
2.2 Basic Test..............................................................................................................................................2
2.2.1 Test Setup...............................................................................................................................2
2.2.2 Test Procedure .......................................................................................................................3
2.3 Extended Test .......................................................................................................................................3
2.3.1 Test Setup...............................................................................................................................3
2.3.2 Test Procedure .......................................................................................................................4
3 OPERATION.......................................................................................................................................................5
3.1 Operators Tasks....................................................................................................................................5
3.2 Handling and Modifying Parameters ...................................................................................................5
3.3 Managing Subscribers (Users) ............................................................................................................8
3.3.1 Assign a WMU to a Subscriber..............................................................................................8
3.3.2 Add Subnet or Device ............................................................................................................8
3.3.3 Remove Subnet or Device .....................................................................................................8
3.3.4 Download Software to WMUs................................................................................................8
3.4 Monitoring System Performance .........................................................................................................8
3.4.1 Log Tool..................................................................................................................................8
3.5 Handling Events and Alarms................................................................................................................8
3.5.1 Events .....................................................................................................................................9
3.5.2 Alarms.....................................................................................................................................9
3.6 Downloading Software Updates ..........................................................................................................9
3.7 Managing Operators.............................................................................................................................9
3.7.1 Access Limits .......................................................................................................................10
3.7.2 Defining Operators...............................................................................................................10
1 INTRODUCTION
This section provides the procedures for testing the system and performing the tasks required
for proper operation.
2 PRE-OPERATIONAL CHECKS
2.1 Procedures
The WMTS system is tested and checked at the installation site at two levels:
Basic level without the wireless components of the system