Technical data
General Information
2400 Series Operation Manual, 33237 Revision A, May 2004 1-3
1.1.3 Items Required
No special tools are required to operate the 2400 Series. Models 24XXAL/AM Series require remote
operation via a computer. Test equipment required for performance verification is described in Chap-
ter 4.
• IEEE 488 Interface Cable (needed for Remote Control Operation)
• RF Output Cabling (Made to fit Female Type SMA Output Connector) (Order Accessory Cable Kit
Accessory A001).
• PC, GPIB or RS-232 needed for remote control operation
• Standard 9 Pin Type D Serial Cable (optional)
1.2 General Information
All instruments are shipped in operational condition. No special installation procedures are required.
Each 2400 Series model must pass rigorous inspections and tests prior to shipment. Following instal-
lation, a performance verification should be performed to ensure that operation has not been
impaired during shipment. The following below apply to all models:
• Warm-up time of 20 minutes for normal operation
• Performance Verification procedures outlined in Chapter 4 for all models.
1.2.1 Cooling
A cooling fan is installed in all four 2400L/AL and 2400M/AM models. The cooling air intake is located
on the rear panel of all models. Care must be taken to avoid obstructing the flow of air into the instru-
ment.
1.2.2 Cleaning
The air intake screen should be cleaned for all four 2400L/AL and 2400M/2400AM models whenever a
significant amount of dust has accumulated on it. Whenever the instrument covers are removed, the
interior should be blown out with a dry air at a low velocity.
1.2.3 Receiving Inspection
Use care when removing the instrument from the carton and check immediately for physical damage,
such as bent or broken connectors on the front and rear panels, dents or scratches on the panels, bro-
ken extractor handles, etc. Check the shipping carton for evidence of physical damage and immedi-
ately report any damage to the shipping center.