Manual
9
ENGLISH
EN
! Packaging elements (nylon bags,
polystyrene foam, staples …) must not be left
within reach of children.
Remove the protective PVC film from the internal
and external walls, avoiding the use of metal
tools.
8.2. Installation
All the installation phases must be considered,
from the moment of creation of the general plan.
The installation area must be equipped with all
power supply and production residue drainage
connections and must be suitably lit and respect
current laws regarding hygiene and sanitary
requirements.
Proceed with machine levelling, adjusting the
individual feet.
! Installation must be carried out by following
the instructions contained in this handbook and
only by a licensed tradesman in accordance with
local codes, or in absence of it, with the National
Fuel Gas Code, ANSI Z 223.1 or with the Natural
Gas Installation Code CAN/CGA-B149.1. The
manufacturer cannot be held liable for any
damage caused by faulty installation.
The place where the machine is to be installed
must have aeration equal to at least that given
in table 1.1, this is in order to supply the
necessary air for combustion, to prevent reaching
too high percentages of gas and to aid evacuation
of the products of combustion.
The installation room must be in conformity with
the current fire regulations.
The unit must operate in a level position. Slight
floor irregularities can be conpensated by turning
the adjustable feet of the cooker either clockwise
or counter clockwise.
Clearances from combustible and non-
combustible construction are given in table 1.2
Model
Power
(BTU/hr)
Air flow
(m
3
/h)
AX-GPC-1
45000
490
AX-GPC-2
90000 980
Table 1.1 Minimum change of air in relation to the
thermal power installed.
Clearances
Combustible
construction
Non combustibile
construction
Side
6.0 ” 0 “
Rear
6.0 ” 0 “
Floor
6.0 ” 0 “
Ceiling
48.0 ”
Table 1.2 Clearances from combustible and non-
combustible construction.
Figure 1 – Removable top flue grid assembly