by concrete with a thickness from 200 to 300 mm according to the soil
strengthness.
The unpacked machine is lifted by crane according to the specified method
and after the anchor and leveling bolts are in place, lower the foundation so
that the anchor bolts enter into the respective holes. The leveling plates (shims)
are placed below the leveling bolts. The guide way horizontality is checked in
longitudinal and transverse direction towards the machine axis by the help of
level with an accuracy of ±0.02/1000 mm and ± 0.04/1000 mm. After this initial
machine leveling had been carried out, pour the holes for the anchor bolts and
the space blew the machine legs with cement putty with ratio between the
cement and sand 1:3
After the cement is setted well (3-4days), tighten the nuts of the anchor bolts
carefully and evenly.
Check the machine leveling once again and if necessary—correct it by the help
of the leveling bolts.
CONNECTION TO THE EL. SUPPLY SOURCE
Check whether the data on the el. panel scheme (voltage and frequency of the
supply source) correspond to the available.
The controlling level should remain in the middle and also press down the
switch to keep the machine power off.
Make sure the lathe in properly grounded.
PUTTING INTO OPERATION
Before starting the machine, clean it once again carefully and lubricate it
according to the Fig. 3a 3b 3c –Lubrication System.
Check the V-Type belt, which located from motor to the low speed wheels,
whether it’s too tight or not. Too tight belt will spoil the bearings, also, if the
V-Type belt is too lengthened, it will skid, so the belt must be adjusted
Starting is effected in the following order:
Check manually the movement of all mechanisms. It shall be smooth. Check
also the operation of all the controls.
Fill the tank of the cooling system with the specified coolant (optional
accessory to be ordered separated). Switch on the main el. motor.