Specifications

ASSEMBLY
/ washers
, Aligned and tighten them as “install the
cast iron extension table.
1. Attach the Cast iron extension table to major table
with 4-M8x20 hex head screws .
Moving & Placing Saw Base Unit
The Sliding Panel Saw is a heavy machine. Serious
personal injury may occur if safe moving methods
are not followed. To be safe, you will need
assistance and power equipment when moving the
shipping crate and removing the machine from the
crate.
Use lifting straps with a minimum of 500 kgs lifting
capacity. If the lifting strap breaks, serious personal
injury may occur.
1. Remove the top of crate and position the forklift forks
2. Center the extension table over the edges and tap it.
together and directly above the saw.
Check the surface alignment.
2. Place four lift rings onto Saw Base Unit and place two
lifting straps over the forks and attach the lifting rings
.
3. Insert a wood block for protecting the main switch.
4. Lift the saw base unit and move it to your
predetermined location.
5. Before lowering the saw into position, place four
rubber blocks under the frame.
6. Lower the saw on the floor.
3.Tighten 4-screws with 13 mm open head wrench.
Attach the steel plate extension table to cast iron
extension table
Install the extension table
Take out the cast iron extension table, steel plate
extension table and rear extension table from the Saw
Base Unite crate.
The cast iron extension table is heavy part that
weighs over 35 kgs. To be safer, you will need
assistance.
Major Table
Major Table
Major Table
Extension Table
Extension Table
Extension Table
Tap Here
Tap Here
Wood Block
View From Top
View From Front
8
Fig 1
Fig 2
Fig 3
Fig 4