Installation Guide
6
Installation – 10452181
Use the rough as a template to mark the positions of the
screw holes in the subfloor. Use an 8 mm bit to drill the
holes.
Install the anchors (included).
Install the screws with the noise reducers and washers.
Make sure that the rough is level.
Wrap the threads on the supplies with Teflon tape.
Install the supplies in the rough. For proper operation of
the tub filler, the hot supply should be installed on the left,
the cold supply on the right.
Remove the flush insert plug from the cold water side of
the rough using a 17 mm wrench. Install a hose bibb
and a hose. Turn on the water and allow the line to flush
thoroughly.
Repeat the flushing procedure on the hot water side.










