Expansion and Contraction
AZEK Deck/Rim Joist Covers/Riser will have expansion and contraction with changes in temperature,
unlike wood whose size will uctuate with moisture changes. The expansion and contraction encountered
may result in slight gaps, which might be noticed at the ends of boards or in splice joints. Fastening the
deck boards according to the Installation Guidelines will help minimize expansion and contraction.
• Expansion/contraction is most signicant where extreme temperature change may exist.
• Best practice is to cut and fasten the deck boards as soon after cutting as possible.
• Install the boards together tightly at splices or miters.
• Be sure to fasten ends of boards, splices, or abutments to building or structure securely into framing
using 2 screws. Position the screws at or within 1/2” of each board end or joint and 3/4” from side of
deck plank.
• Provide a 1/8” to 1/4” side to side gap between deck boards.
• In areas with obstructed airow such as roofs and on-grade applications, a minimum of 1-1/2” sleeper
system supported by and connected to the substructure over which the deck is built is required.
All deck frames and substructure should be securely attached to ground footings or building
structure. No oating substructures should be used (from preparation section AZEK).
For best results, stagger splices and miters across deck surface so that all splices and miters do not
break on the same joist or beam.
To further minimize expansion and contraction, proper ventilation and air ow should be considered.
Some area building codes may require double joisting when joining boards end to end. Double
joists are always required at butt joints when using CONCEALoc. Always check with your local code
authority for specic requirements before installation.