Installation Guide

Page 22
Installing AZEK Rail Stairs with CableRail by Feeney
®
Lower the rails perpendicular to
the deck surface.
TRANSFER HOLE
LOCATION ON
POST SLEEVE
• Mark Ends of Top Support Rail.
• Rotate Rail assembly out of way to fasten Support Block.
• Secure Mounting Brackets to Posts.
10
8
9
Use a 3/16” drill bit to
transfer marks onto the
Post Sleeve
Pre-drill
7/64”
#8 x 3” Green
Coated
Screws
Pre-drill
7/64”
#8 x 3” Green
Coated
Screws
b c d
Lower the rails perpendicular to
the deck surface.
• Place the Bottom
Rail over the Bottom
Support Rail with
the Intermediate
Baluster(s).
• Use an extra
Intermediate
Baluster as a
template to mark
for CableRail
hardware and
through holes.
INSTALL BOTTOM
RAIL
ATTACH TOP SUPPORT RAIL
Use a 3/16” drill bit to
transfer marks onto the
Post Sleeve
template to mark
for CableRail
hardware and
through holes.
Step 1
Step 2
a