Installation Guide

Page 33
INSTALL TOP RAIL AND POST CAPS
10
• Attach Post Caps using exterior grade caulk applied to the underside of the Cap.
#8 x 2 1/4”
Coated Screws
3/16” Pre-drill
through existing
holes in Top Glass
Channel and
through the Top
Support Rail.
Caution: Screws must
be 2 1/4” to attach the
Top Rail on the Straight
Rail sections.
Installing AZEK Rail with Glass Infi ll