User Manual
97 
4.  Repeat this procedure by entering the meter readings for points 
2 – 4. 
5.3  OVP Calibration  
The overvoltage protection (OVP) calibration can be executed right after 
the voltage calibration or the user can select OVP in the CAL menu. 
Follow the steps below to perform the overvoltage protection 
calibration: 
1.  Disconnect any load from the output terminal of the power 
supply. 
2.  Select the OVP parameter in the CAL menu and press  . The 
following will be displayed: 
3.  Press   to run the OVP calibration or press   to abort. The 
OVP calibration is an automatic process that will take about 10 
to 20 seconds. 
4.  After the calibration is finished, the following message will be 
displayed: 










