User Manual
100 
The P: 1/2 signifies there are 2 points to be calibrated and the 
current calibration point is 1. 
3.  Input the voltage reading from the DMM in the METER 
parameter by using the numeric keypad and press  . 
4.  Repeat this procedure by entering the meter readings for points 
2. 
5.6  External Current Programming 
Calibration  
Follow the steps below to perform the external current programming 
calibration: 
1.  Connect the DMM to the external analog control terminals of 
DB25 connector (+ on the DMM to Pins 10 and 24, - on the 
DMM to Pin 22(GND)) on the rear of the power supply, as shown 
in the figure below: 
Figure 5.5 – External Current Programming Calibration Diagram  










