Instructions / Assembly

4 Ft Monkey Bar
Phase 1
Phase Notes
• You will build a left and right top rail assembly in this phase.
• After building left assembly as shown, repeat steps for right assembly.
See below for oreintation of right side triangle plate.
• Assemble with hardware as shown.
TRIANGLE PLATE 100 4 HOLE
(BE SURE TO PLACE FLAT SIDE OF PLATE AGAINST SIDE OF BOARD)
BOLT WH 5/16x1-1/2
T-NUT 5/16
BOLT WH 5/16x2
L BRACKET GREEN 54x67
NUT LOCK 5/16
WASHER FLAT 8x27
E71
RIGHT SIDE VIEW OF TRIANGLE PLATE
QTY DESCRIPTION LABEL
2 MONKEY BAR RAIL E71
2
TRIANGLE PLATE 100 4 HOLE DH
4 L BRACKET GREEN 54x67 EJ
4 T-NUT 5/16 BG
4 BOLT WH 5/16x1-1/2 H
2 WASHER FLAT 8x27 CD
2 NUT LOCK 5/16 CJ
2 BOLT WH 5/16x2 K