Instructions / Assembly

Fort Assembly
Phase 3
Phase Notes
• Assemble with hardware as shown.
• For ease during assembly, assemble
uprights flat on the ground.
Parts needed:
• (1) H1 - ROOF CROSS BRACE - W101162
• (1) G1 - SWING BEAM ATTACHMENT RAIL - 101163
• (1) K5 - FORT RAIL - W101164
• (1) H3 - FLOOR JOIST - W101166
• (1) K4 - FORT GROUND BOARD - W101161
• (1) E1 - FORT UPRIGHT - W101160
• (1) E2 - FORT UPRIGHT - W101170
Hardware needed:
• (8) K - BOLT WH 5/16x2 - H100012
• (14) AD - WASHER LOCK EXT 12x19 - H100031
• (14) AC - WASHER LOCK EXT 8x19 - H100030
• (14) D - NUT BARREL WH 5/16x7/8 - H100005
• (6) H - BOLT WH 5/16x1-1/2 - H100010
Step 1:
Attach 'H1' Roof Cross
Brace to 'E1' & 'E2' Fort
Uprights using hardware 'K',
'AC', 'AD' and 'D', as shown.
K
AC
D
AD
E1
H1
E2
D
AD
AC
H
G1
D AD
AC
K
H3
D
AD
AC
H
K4
K5
K
Step 2: Attach 'G1' Swing Beam
Attachment Rail to 'E1' & 'E2'
Fort Uprights using hardware
'K', 'AC', 'AD' and 'D', as shown.
Step 3:
Attach 'K5' Fort Rail to
'E1' & 'E2' Fort Uprights using
hardware 'H', 'AC', 'AD' and 'D',
as shown.
Step 4: Attach 'H3' Fort Joist to
'E1' & 'E2' Fort Uprights using
hardware 'K', 'AC', 'AD' and 'D',
as shown.
Step 5:
Attach 'K4' Fort Ground
Board to 'E1' & 'E2' Fort Uprights
using hardware 'H', 'AC', 'AD' and
'D', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.