Instructions / Assembly

Fort Assembly
Phase 5
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (1) K2 - DOUBLE ARCHED FORT RAIL - W101177
• (1) K3 - ARCHED FORT RAIL - W101178
• (1) M8 - PERGOLA WALL RAIL - W101204
• (2) M3 - FLOOR SUPPORT - W101167
Hardware needed:
• (20) Z - LAG SCREW WH 5/16x2 - H100027
• (20) AC - WASHER LOCK EXT 8x19 - H100030
Step 1:
Attach 'K2' Double Arched Fort
Rail to the edges of 'E1', 'E4' & 'E5' fort
uprights using hardware 'Z' & 'AC', as
shown.
Z
AC
Z
AC
Z
AC
Z
AC
AC
Z
Z
AC
K2
K3
M8
M3
M3
E5
E5
E3
E4
E1
E2
Step 2: Attach 'M3' Floor
Support to the edges of
'E1', 'E4' & 'E5' fort
uprights using hardware
'Z' & 'AC', as shown.
Step 3: Attach 'K3'
Arched Fort Rail
to the edges of
'E2', 'E3' & 'E5' fort
uprights using
hardware 'Z' &
'AC', as shown.
Step 4: Attach 'M8' Pergola
Wall Rail to the edges of
'E2' & 'E3' fort uprights
using hardware 'Z' & 'AC',
as shown.
Step 5: Attach 'M3' Floor
Support to the edges of
'E2', 'E3' & 'E5' fort
uprights using hardware
'Z' & 'AC', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.