Instructions / Assembly

Fort Assembly
Phase 6
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) H5 - OUTER FLOOR SUPPORT - W101183
• (2) J1 - FLOOR SUPPORT - W101037
Hardware needed:
• (12) BP - SCREW PFH 8x1-1/2 - H100086
• (4) BS - SCREW PFH 8x1-3/4 - H100089
Step 2:
Insert 'H5' Outer Floor Support
between 'M3' floor supports making
sure that the top edges of the boards
are flush and the ends of the 'H5'
boards are aligned with the pre-drilled
holes. Secure the 'H5' supports using
Screws 'BP', as shown.
BP
J1
BS
E4
M3
BP
BP
BP
BP
BP
H5
H5
M3
M3
E3
E4
Step 1: Attach 'J1' Floor Support to 'E4'
fort upright using Screws 'BS' and 'M3'
floor supports using Screws 'BP', as
shown. Make sure that the top edges of
the boards are flush and the ends of
the 'J1' boards are aligned with the
pre-drilled holes in 'M3' boards.
Note: It is vital that the fort
be level before and after
each phase of assembly.