Instructions / Assembly

Fort Assembly
Phase 7
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (7) M1 - CENTER FLOOR BOARD - W101181
• (4) M2 - OUTER FLOOR BOARD - W101180
• (2) Y1 - END FLOOR BOARD - W101179
• (2) Y2 - END FLOOR BOARD - W101171
Hardware needed:
• (105) BP - SCREW PFH 8x1-1/2 - H100086
Step 1:
Attach 'Y1' & 'Y2' End Floor Boards to 'M3' Floor
Support, 'H3' Floor Joist and 'J1' Floor Support using
Screws 'BP', as shown.
Step 2:
Attach 'M2' Outer Floor
Board to 'H3' Floor Joist and 'H5'
Outer Floor Supports using
screws 'BP', as shown.
Step 3: Attach 'M1' Center Floor
Board to 'H3' Floor Joist and 'H5'
Outer Floor Supports using screws
'BP', as shown.
BP
BP
BP
Y2
Y1
M2
M2
Y2
Y1
M1
M3
M3
Note: It is vital that the fort
be level before and after
each phase of assembly.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.