Instructions / Assembly

Fort Assembly
Phase 8
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (1) N2 - FLOOR CLEAT - W101184
• (4) M13 - WALL RAIL - W101185
• (2) M15 - WALL RAIL - W101186
• (1) M4 - WALL RAIL - W101188
• (1) M5 - WALL RAIL - W101187
Hardware needed:
• (8) BR - SCREW PFH 8x1-1/8 - H100088
• (6) H - BOLT WH 5/16x1-1/2 - H100010
• (10) AC - WASHER LOCK EXT 8x19 - H100030
• (6) AD - WASHER LOCK EXT 12x19 - H100031
• (6) D - NUT BARREL WH 5/16x7/8 - H100005
• (4) Z - LAG SCREW WH 5/16x2 - H100027
Step 1:
Attach 'M13'
Wall Rails to 'E5',
'E4', & 'E3' fort
uprights using
hardware 'H', 'AC',
'AD' and 'D', as
shown.
Step 3: Pre-drill & attach 'M15' Wall
Rail to the edge of 'E4' & 'E1' fort
uprights using hardware 'Z' & 'AC',
as shown.
Step 2:
Attach 'N2' Floor
Cleat to 'M1' center floor
board using screws 'BR',
as shown.
Step 4:
Pre-drill and attach
'M5' Wall Rail to 'E2' & 'E3' fort
uprights using hardware 'Z' &
'AC', as shown.
N2
BR
M1
H
AC
H
AC
AC
Z
D
AD
AC
H
AC
Z
M4
M15
M5
M13
M15
M13
M13
M13
E3
E4
E1
E2
E5
AD
D
AD
D
Note: It is vital that the fort
be level before and after
each phase of assembly.
AC
Z
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.