Instructions / Assembly

Fort Assembly
Phase 9
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (6) M10 - FORT RAIL - W101190
• (2) M9 - HANDLE WALL RAIL - W101191
• (2) EJ - L BRACKET GREEN 54x67 - A100053
Hardware needed:
• (32) BR - SCREW PFH 8x1-1/8 - H100088
• (4) BL - SCREW TAPPING 14x3/4 - H100083
Step 2:
Pre-drill & attach 'M10' Fort
Rails to 'K2' double arched fort rail &
'M15' wall rails using Screws 'BR', as
shown.
Step 3:
Pre-drill & attach 'M9' Handle Wall
Rail to 'K2' double arched fort rail using
Screws 'BR', as shown. Pre-drill & attach
'EJ' L Bracket Green 54x67 to 'M9' handle
wall rail and 'M2' outer floor board using
Screws 'BL', as shown.
M9
M10
M9
BR
BL
M15
EJ
M10
M10
BR
BR
Step 1:
Pre-drill & attach 'M10' Fort Rails
to 'K6' arched fort rails & 'M13' wall rails
using Screws 'BR', as shown.
K6
M13
M13
K6
K2
M2
BR
K2
M10
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Note: It is vital that the fort
be level before and after
each phase of assembly.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.