Instructions / Assembly

Fort Assembly
Phase 12
Parts needed:
• (2) M14 - TOYBOX SUPPORT BOARD - W101197
• (4) M12 - TOYBOX BOARD - W101193
• (2) N3 - TOYBOX BOARD - W101194
• (4) K8 - TOYBOX BOARD - W101192
Hardware needed:
• (20) BR - SCREW PFH 8x1-1/8 - H100088
• (16) BP - SCREW PFH 8x1-1/2 - H100086
Phase Notes
• Assemble with hardware as shown.
M12
N3
M12
BR
M14
BR
K8
BP
K8
Step 1:
Attach 'M14' Toybox Support Board to
'M12' & 'N3' Toybox Boards using Screws 'BR',
as shown. Repeat step 1 to build opposite side
wall of toybox.
Step 2:
Pre-drill & attach 'K8'
Toybox Boards to the edges of
'E6' pergola uprights using
Screws 'BP', as shown.
Step 4:
Pre-drill & attach
remaining 'K8' Toybox Board to
the edges of 'M12' toybox wall
assembly boards using Screws
'BP', as shown.
Note:
Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
E6
Step 4: Attach Toybox wall
assembly to 'K4' fort ground
boards using Screws 'BR', as
shown.
K4
K4