Instructions / Assembly

Fort Assembly
Phase 13
Parts needed:
• (3) M6 - TOYBOX TOP BOARD - W101198
Hardware needed:
• (12) BP - SCREW PFH 8x1-1/2 - H100086
Phase Notes
• Assemble with hardware as shown.
M6
BP
K8
Step 1: Pre-drill & attach 'M14' Toybox Support
Board to the top edges of 'M12' & 'N3' Toybox
Boards using Screws 'BR', as shown.
Note:
Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
M12
N3
M12