Instructions / Assembly

Fort Assembly
Phase 15
Hardware needed:
• (4) Z - LAG SCREW WH 5/16x2 - H100027
• (4) AC - WASHER LOCK EXT8x19 - H100030
• (20) BP - SCREW PFH 8x1-1/2 - H100086
• (10) BT - SCREW PFH 8x2-1/2 - H100090
• (4) BV - SCREW PFH 8x2-1/4 - H100091
Parts needed:
• (1) P1 - PERGOLA SUPPORT RAIL - W101196
• (1) H2 - PERGOLA FRONT SUPPORT - W101195
• (10) H8 - PERGOLA SIDE RAIL - W101202
Phase Notes
• Assemble with hardware as shown.
M8
BP
H8
Z
AC
BT
H2
E6
P1
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 2:
Pre-drill & attach 'H2'
Pergola Front Support to 'E6'
pergola uprights using Lag
Screw 'Z' and Washer 'AC', as
shown.
Step 3:
Pre-drill & attach 'H8'
Pergola Side Rails to 'M8'
pergola wall rail using Screws
'BP'. Finish securing 'H8' pergola
side rails by attaching the 'H8'
rails to 'P1' Pergola Support Rail
using Screws 'BT', as shown.
Step 1: Center & Pre-drill 'P1' Pergola
Support Rail on 'H2' Pergola Front Support
and secure using screws 'BV', as shown.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
BV
P1
H2
BT
P1
H2