Instructions / Assembly

Fort Assembly
Phase 19
Hardware needed:
• (32) BQ - SCREW PFH 8x1-1/4 - H100087
• (28) BN - SCREW PFH 8x1 - H100085
• (10) DA - SCREW PWH 10x1/2 - H100132
Parts needed:
• (1) K9-2 - ROOF SLAT - W101211
• (3) K9-3 - ROOF SLAT - W101208
• (2) K9-4 - ROOF SLAT - A101210
• (1) K9-5 - ROOF SLAT - W101213
• (2) K9-6 - ROOF SLAT - W101209
• (2) H7 - ROOF TRUSS - W101205
• (2) N4 - GABLE CLEAT - W101212
• (1) DE - PLATE FORT 5 HOLE GREEN - A100011
• (1) GK - WINDOW FRAME GREEN 216x267 - A100146
Phase Notes
• Assemble with hardware as shown.
K9-2
K9-3
K9-4
K9-6
K9-5
K9-3
N4
BN
BQ
H7
H7
DE
DA
GK
BQ
H7
H7
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
Step 1: Pre-drill and attach 'K9-2', 'K9-3',
'K9-4', 'K9-5', 'K9-6' Roof Slat to 'H7'
Roof Trusses using Screws 'BQ', as
shown. Use dimensions provided to
locate the first roof slat during the
assembly process.
Step 2:
Attach 'N4' Gable Cleat flush with
the edge of roof slats using Screws 'BN', as
shown. Repeat step to attach the other 'N4'
gable cleat to the gable end, as shown.
Step 3: Pre-drill and attach 'DE'
Plate Fort 5 Hole Green flush with
outer edge of 'H7' roof trusses
using Screws DA, as shown.
Step 4: Pre-drill and attach 'GK' Window
Frame Green 216x267 to roof slats using
Screws 'BQ', as shown.
Step 5: Repeat steps 1 thru 4 to assemble
second gable end assembly.