Instructions / Assembly

Fort Assembly
Phase 21
Hardware needed:
• (96) BS - SCREW PFH 8x1-3/4 - H100089
• (24) BN - SCREW PFH 8x1 - H100085
Parts needed:
• (24) K9-1 - ROOF SLAT - W101206
• (2) N1 - ROOF CLEAT - W101207
Phase Notes
• Assemble with hardware as shown.
BS
K9-1
BS
K9-1
H7
H7
N1
K9-1
BN
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
Step 1: Starting at the peak of
roof, attach a 'K9-1' Roof Slat
flush at peak and with a 1-5/8"
overhang and secure using
Screws 'BS', as shown.
Step 2: Flush another 'K9-1' roof slat to
the one just installed and then eleven
more to each side, using Screws 'BS', as
shown.
Step 3:
Pre-drill, attach and
center 'N1' Roof Cleat to the
inside of 'K9-1' Roof Slat and
secure using Screws 'BN', as
shown. Use dimensions
provided to help center and
attach roof cleats to the
assembly.