Instructions / Assembly

Rackwall Attachment
Phase 23
Parts needed:
• (1) ROCK WALL ASSEMBLY
Phase Notes
• Assemble with hardware as shown.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 1:
Attach Pre-assembled Rock Wall
Assembly to 'M3' floor support using Lock
Washer 'AC' and Lag Screw 'AA', as shown.
Hardware needed:
• (2) AA - LAG SCREW WH 5/16x2-1/2 - H100028
• (2) AC - WASHER LOCK EXT 8x19 - H100030
M3
AC
AA
This view is looking up at the bottom of the
floor boards.