Instructions / Assembly

10 FOOT SLIDE ASSEMBLY
STEP 4
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 3" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH
8x3
(38)
SCREW PFH 8x3
(19 PLCS)
SCREW PFH 8x3
(19 PLCS)