User's Manual
Table Of Contents
- DISCLAIMER
- QUESTIONS OR SERVICE ASSISTANCE
- PRODUCT IDENTIFICATION
- SCOPE OF MANUAL
- PRODUCT UNPACKING AND INSPECTION
- LICENSE REQUIREMENTS
- INSTALLATION TOOLS and MATERIALS
- INSTALLATION of BADGER ORION INTEGRAL TRANSMITTER and INDEX
- AMERICAN® GAS METERS
- Index Removal From an American Gas Meter
- ORION Installation Components for an American Meter
- Assemble the ORION Transmitter and Index
- Place the Cover Over the Transmitter and Index
- Final Assembly
- Drive pawl engagement and installation of index
- Index Installation
- Place four (4) screws into the transmitter
- Program the Transmitter
- APPENDIX
Installation Data
Assemble the ORION Transmitter and Index
Transmitter gaskets attachment
The gaskets should be attached to the transmitter at the factory. If the gaskets are not attached:
1. Place the rear gasket on the back of the transmitter so that the tab is at the top of the transmitter, the drain slots are
pointing down, facing towards the gas meter.
Figure 8: Rear Gasket Placement
2. Place the front gasket on the other side of the transmitter. Place the gasket so that its two holes go over the two
protruding tines. Be sure the notched end goes around the guide pin on the right side of the transmitter.
Figure 9: Front Gasket Placement
NOTE: Be certain that the stepped edge is toward the transmitter boot and seated between the transmitter sealing face
and the alignment tabs.
Figure 10: Gasket Placement (continued)
Drain Slots Towards Gas Meter
Tab on Top
Drain Slots Pointing Down
Holes Over Tines
Notched End Around Guide Pin on
Right of Transmitter
(8-10)
Page 11