User's Manual
Table Of Contents
- DISCLAIMER
- QUESTIONS OR SERVICE ASSISTANCE
- PRODUCT IDENTIFICATION
- SCOPE OF MANUAL
- PRODUCT UNPACKING AND INSPECTION
- LICENSE REQUIREMENTS
- INSTALLATION TOOLS and MATERIALS
- INSTALLATION of BADGER ORION INTEGRAL TRANSMITTER and INDEX
- AMERICAN® GAS METERS
- Index Removal From an American Gas Meter
- ORION Installation Components for an American Meter
- Assemble the ORION Transmitter and Index
- Place the Cover Over the Transmitter and Index
- Final Assembly
- Drive pawl engagement and installation of index
- Index Installation
- Place four (4) screws into the transmitter
- Program the Transmitter
- APPENDIX
ORION® SE American® Residential Gas Meter Transmitter
Place four (4) screws into the transmitter
1. Place the four (4) ¼-20 X 3/8" screws through the transmitter and rear gasket from the front.
Figure 11: Screw Placement
2. The screws are temporarily held in place by the rear gasket.
Figure 12: Screws held in place
Gasket Lip
Tab Up
Drain Slots Facing Down and Towards
the Gas Meter
Screws Held in Place
Page 12
(8-10)