User's Manual
Table Of Contents
- DISCLAIMER
- QUESTIONS OR SERVICE ASSISTANCE
- PRODUCT IDENTIFICATION
- SCOPE OF MANUAL
- PRODUCT UNPACKING AND INSPECTION
- LICENSE REQUIREMENTS
- INSTALLATION TOOLS and MATERIALS
- INSTALLATION of BADGER ORION INTEGRAL TRANSMITTER and INDEX
- AMERICAN® GAS METERS
- Index Removal From an American Gas Meter
- ORION Installation Components for an American Meter
- Assemble the ORION Transmitter and Index
- Place the Cover Over the Transmitter and Index
- Final Assembly
- Drive pawl engagement and installation of index
- Index Installation
- Place four (4) screws into the transmitter
- Program the Transmitter
- APPENDIX
Installation Data
Placing a two feet dial
1. Align the rear transmitter drive pawl and the gas meter pawl. Place the four (4) ¼-20 X 3/8" transmitter screws
against the holes in the gas meter.
Figure 21: Two-feet Dial Placement
Placing a one foot index
1. Place the transmitter against the gas meter.
2. Place the transmitter drive pawl so it is around the gas meter pawl.
Figure 22: One-foot Index Placement
Transmitter
Pawl
Gas Meter
Pawl
Gas Meter Pawl
Transmitter Pawl
(8-10)
Page 17