User's Manual
Table Of Contents
- DISCLAIMER
- QUESTIONS OR SERVICE ASSISTANCE
- PRODUCT IDENTIFICATION
- SCOPE OF MANUAL
- PRODUCT UNPACKING AND INSPECTION
- LICENSE REQUIREMENTS
- INSTALLATION TOOLS and MATERIALS
- INSTALLATION of BADGER ORION INTEGRAL TRANSMITTER and INDEX
- AMERICAN® GAS METERS
- Index Removal From an American Gas Meter
- ORION Installation Components for an American Meter
- Assemble the ORION Transmitter and Index
- Place the Cover Over the Transmitter and Index
- Final Assembly
- Drive pawl engagement and installation of index
- Index Installation
- Place four (4) screws into the transmitter
- Program the Transmitter
- APPENDIX
Installation Data
Place the Cover Over the Transmitter and Index
1. Verify the front gasket is set properly.
Figure 25: Gasket Seating Verification
2. Place the cover on the gas meter and tighten it with the four (4) remaining screws (15 in-lbs max).
Figure 26: Secure Cover
The transmitter unit is now ready for programming.