User's Manual
Table Of Contents
- DISCLAIMER
- QUESTIONS OR SERVICE ASSISTANCE
- PRODUCT IDENTIFICATION
- SCOPE OF MANUAL
- PRODUCT UNPACKING AND INSPECTION
- LICENSE REQUIREMENTS
- INSTALLATION TOOLS and MATERIALS
- INSTALLATION of BADGER ORION INTEGRAL TRANSMITTER and INDEX
- AMERICAN® GAS METERS
- Index Removal From an American Gas Meter
- ORION Installation Components for an American Meter
- Assemble the ORION Transmitter and Index
- Place the Cover Over the Transmitter and Index
- Final Assembly
- Drive pawl engagement and installation of index
- Index Installation
- Place four (4) screws into the transmitter
- Program the Transmitter
- APPENDIX
ORION® SE American® Residential Gas Meter Transmitter
2. Use a large screwdriver to remove and discard the four (4) mounting screws and the cover.
Figure 3: Cover Removal
3. Completely remove and discard the old gasket. Use a putty knife to clean the meter surface of all gasket remnants
that might limit the eectiveness of the new gasket.
Figure 4: Gasket Removal
Page 8
(8-10)