User's Manual
ORIONĀ® SE Integral Endpoint for AmericanĀ® Residential Meters
PLACE THE COVER OVER THE ENDPOINT AND INDEX
1. Verify the front gasket is set properly.
2. Place the cover on the gas meter and tighten it with the four (4) remaining screws (15 in-lbs max).
The endpoint unit is now ready for programming.
Page 16
(1-11)