User's Manual

Page 19
12-10
Installation & Operation Manual
Loading and Unloading a Route
This section describes detailed ORS screens and procedures that begin with loading the ORION Software and culminate with
the unloading process.
Out-of -Scope
The examples provided in this section do not include Reading Data Management Software procedures to create route
information to Load ORS, nor does it include Reading Data Management Software procedures to store the captured meter
information.
Load Example
1. Obtain a ash drive memory stick that contains les from the Reading Data Management Software route information
for the route you intend to read.
2. Insert the ash drive into the USB port of the ToughBook.
3. From the Windows desktop , double-click the ORION icon, enter your initials on the Splash Screen, and then select
Accept.
Result: The Main Menu is displayed.
Figure 12: Main Menu - Load ORION Software
4. Click Load to load the route les.
Result: The Select Folder screen is displayed: