User's Manual

Installation & Operation Manual
7. Place a lock washer and nut on each bolt and tighten the nuts 100…150 inch-pounds to ensure the network gateway
transceiver is suciently secured to the pole.
8. Repeat Steps 7 and 8 for attaching the V-block clamp mounting bracket hardware to the bottom bolts of the network
gateway transceiver mounting backplate.
Side View Back View Side View
Figure 5: Completed Network Gateway Transceiver Mounting (GPRS unit shown)
Banding Mounting
This mounting equipment is sized to mount the network gateway transceiver on a 2-1/2…24-inch outer diameter pole.
IMPORTANT
When using the banding mounting kit for the network gateway transceiver, use BAND-IT Idex installation practices. Refer to
www.band-it-idex.com/en/Literature/Tool_Instructions/P05886.pdf for more information. This is especially applicable when
mounting on a non-tapered vertical pole, as the banding could loosen over time resulting in the unit sliding down the pole.
To mount the ORION SE network gateway transceiver on a pole, gather the banding and locking equipment.
Figure 6: Banding and Locking Equipment
Page 9 June 2012










