ORION® Fixed Network – Metal Lid Endpoint
Figure 5: Compress the gel cap
• Repeat the crimping procedure for the remaining gel caps and wires.
4. Attach the two plastic cable ties and tighten securely for strain relief. Snip o the excess cable tie with the wire cutter.
Figure 6: Wire tie attachment locations
5. To complete the pit installations, use an appropriate secondary eld splice kit. If using the Badger Meter Field Splice
Kit, refer to the Field Splice Kit Application Data Sheet provided with the kit.
Testing Wire Connections
It is recommended that you test all wiring connections to confirm connectivity and to verify the ORION endpoint reading
and the encoder reading are the same. The connections can be tested using the Quick Read function with either an
ORION handheld or mobile data collector. See the appropriate software manual, available at www.badgermeter.com, for
more information.