User's Manual
Table Of Contents
Installation Manual
POWER SOURCE CONFIGURATIONS
Access to Power
• The ORION SE II network gateway transceiver requires access to power. The gateway can use a 120V AC grounded
outlet for use with the AC-to-DC power supply and power cord (PN: 66528-002), or a DC power source for use with
the DC power source cable with 308 in-line connector (PN: 66233-020). For a gateway with a LAN PoE configuration,
a Power over Ethernet connection is required. Diagrams of each power source configuration start on page 18.
• Outlet and enclosure (if required) should be mounted for easy accessibility by authorized utility personnel at the
installation site.
• Consult the appropriate electrical, building and industry codes, regulations and standards for accepted installation
practices for use of the AC-to-DC power supply and outlet in environmentally controlled indoor locations.
Use of a NEMA 4 Enclosure
AC-to-DC power supply used outdoors or in a non-environmentally controlled indoor location requires a customer-supplied
NEMA 4 enclosure, or equivalent, installed in accordance with appropriate electrical codes, building codes, industry codes,
regulations and standards.
Recommended Installation Congurations
These are the standard recommended installation configurations with various combinations of backhaul and power source:
• GPRS with 120V AC power source
• LAN with 120V AC power source
• GPRS with DC power source
• LAN with DC power source
• LAN with PoE power source
Diagrams of the above configurations are shown on the pages that follow. Consult the diagram for your
installation configuration.
Page 17 October 2013