User's Manual

Installation Manual
8. Remove and discard the cap from the M12 receptacle on the bottom of the gateway transceiver.
Figure 25: Bottom of gateway transceiver
9. Connect the M12 plug connector assembly to the M12 receptacle and tighten the locking ring in a clockwise
direction until nger tight.
10. Connect the 308 connector on the other end of the power cable to the 308 connector of the AC-to-DC power supply
and snap the anti-tamper collar over the connection.
11. Connect the power cord to the power supply and then plug the three-prong male end of the power cord into a
120V AC power source. The LED indicator above the M12 connection turns on with a steady green light, indicating
the gateway is being AC powered (Figure 26).
OTE:N A red blinking light indicates the gateway is being powered only by the internal backup battery.
No light indicates the gateway is not receiving AC or backup battery power.
Figure 26: Gateway on AC power
The M12 connection is complete.
M12 Receptacle
with Cap Removed
RJ45 Receptacle
Gateway on
AC Power
Page 25 October 2013