User's Manual
Table Of Contents
- Introduction
- Glossary
- Trimble Ranger Handheld Overview
- Conserving the Battery
- Charging the Handheld Battery
- Handheld Setup for Reading Both ORION ME and ORION CE Endpoints
- Handheld Basic Operations
- Swapping the Battery Pack (Low Battery)
- General Care of the Handheld
- Using the Touch Screen
- Program Startup
- Copyright Screen
- Main Menu
- Reading a Route
- Manual Reads
- Read Results
- Read Menu
- Comments
- Read Direction
- View High/Low
- Manual Read
- _
- Utilities
- Route Info
- Program & Quick Read
- ORION CE
- ORION ME/SE Utility
- Utilities
- PROGRAMMING AN ORION GAS MODULE
- Appendix
- Using the Handheld Keypad
- Hot Keys and Quick Keys
- Technical Support
Page 48
1-12
ORION® Automated Meter Reading System for Trimble® Ranger™
Install
The purpose of the Install tab is to let the installer know that the endpoint is being heard from at least one gateway and
that it will switch over to fixed network mode. It also may be used to troubleshoot. If the endpoint fails to switch to a fixed
network, it can be manually assigned to a certain gateway, however, it is always best to let the system decide which gateway
the endpoint gets assigned to.
Step 1 - With the Install tab selected, tap Initial Read.
Step 2 - Tap IR START.
Figure 56: Step 1
Figure 57: Step 2
Step 3 - Tap RF GO!
Step 4 - The endpoint heard from the gateways are listed as shown in Figure 59. Tap Finish.
Figure 58: Step 3 Figure 59: Step 4










