User's Manual

Page 6
1-12
ORION® Automated Meter Reading System for Trimble® Ranger™
Product Unpacking and Inspection
Upon opening the shipping container, visually inspect the product and applicable accessories for any physical damage such
as scratches, loose or broken parts, or any other sign of damage that may have occurred during shipment.
Note: If damage is found, request an inspection by the carriers agent within 48 hours of delivery and file a claim with the
carrier. A claim for equipment damage in transit is the sole responsibility of the purchaser.
License Requirements
ORION meter reading systems comply with Part 15 of FCC Rules. Operation of the ORS is subject to the following conditions:
(1) The ORION meter reading systems may not cause harmful interference, and (2) the ORION meter reading systems must
accept any interference received, including interference that may cause undesired operation.
In accordance with FCC Regulations, “Code of Federal Regulations” Title 47, Part 2, Subpart J, Section 1091, endpoints
(endpoints) pass the requirements pertaining to RF radiation exposure. However, to avoid public exposure in excess of limits
for general population (uncontrolled exposure), a 20 centimeter distance between the mobile device and the body of the
user must be maintained during testing.
No FCC license is required by a utility to operate an ORION meter reading system.
ORION meter reading systems comply with Industry Canada license-exempt RSS standard(s). Operation is subject to the
following two conditions: (1) they may not cause interference, and (2) they must accept any interference, including
interference that may cause undesired operation of the device.
Le présent appareil est conforme aux CNR d'Industrie Canada applicables aux appareils radio exempts de licence.
L'exploitation est autorisée aux deux conditions suivantes: (1) l'appareil ne doit pas produire de brouillage, et (2) l'utilisateur
de l'appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible d'en compromettre le
fonctionnement.
Any changes made, but not approved by Badger Meter, can void the user's authority to operate the equipment.