Installation Guide

Nova-233 G2 Outdoor LTE TDD Base Station Installation Guide
10
reliable. Rustproofing the terminals is required. This can be done with rust
preventing paint, anti-oxidation coatings, grease, and so on.
Weatherproof Protection 2.6
The Nova-233 G2 adopts cold shrink tube for weatherproof protection. Before
installing the cold shrink tube, clean up the interface first. The weatherproof protection
steps are as follows:
1. Insert cable into cold shrink tube.
2. Tighten the connector.
3. Push the cold shrink tube to the top joint and pull out the strip.
4. Check whether the cold shrink tube tight connect with the connection.