Product Manual
3-2 Receiving & Installation MN2421
Table 3-1 POW’R LITE Option Dimensions
Generator A (max) A1 (min) A2 (max) B C
TS25 33’ 8” 11’ 5−
1
/
2
” 92.20 159.04 134.13
TS35 33’ 8” 11’ 5−
1
/
2
” 92.20 159.04 134.13
TS45 35’ 3−
3
/
4
” 16’ 9−
3
/
8
” 112.25 162.25 135.89
TS60 35’ 3−
3
/
4
” 16’ 9−
3
/
8
” 112.25 162.25 135.89
TS80 35’ 3−
3
/
4
” 16’ 9−
3
/
8
” 112.25 162.25 135.89
Installation of Optional POW’R LITE Kit
Before completion of the Generator installation and start−up, the POW’R LITE feature should be
installed while the battery is disconnected (as received from the factory). Be sure to have a lift
available to raise heavy components into position and hold them while they are fastened securely
in place. A fork lift or other lift device is recommended.
First, several brackets need to be installed, refer to Figure 3-2. The hitch and other items are not
shown to enhance viewing of items being installed.
1. Remove the five (5) screws and associated hardware shown in Figure 3-2.
The captive nuts must be pushed out to allow clearance for new bolts to be installed.
2. Locate the Mast Support bracket and associated hardware shown in Figure 3-2.
3. Install Mast Support bracket where the five (5) screws were removed in step 1,
securely tighten all hardware.
4. Locate the Yoke bracket and associated hardware shown in Figure 3-2.
5. Install Yoke bracket at the lift ring as shown, securely tighten all hardware.
6. Locate Outrigger Support assembly, three Hold Down Plates and associated hardware
shown in Figure 3-2.
7. Raise the Outrigger Support assembly close to the “Front Frame Member” so that the
three tabs rest on the forward surface of the frame member.
8. Hold in position and place the Hold Down Plate on top of the Outrigger Support
assembly so it is in good contact with the frame member and secure using associated
hardware, see Figure 3-2. Repeat for all 3 Hold Down Plates.
9. Securely tighten all hardware.
10. Install the 3 cable clamps on the front panel of the generator as shown in Figure 3-2.
These clamps will secure the POW’R LITE cable when it is installed later.
Figure 3-2 Bracket & Outrigger Installation
Remove
these 5 screws
Yoke Bracket
Front Frame
Member
Outrigger Support
Tab
Hold Down Plate
See
Detail
Cable
Clamps
Mast
Support
Bracket
1
/
4
−20 x 1”
(4)
5
/
16
−18 x 1”
1
/
2
−13 x 2.5”
5
/
16
−18 x 2.25”
1
/2−13 x 4”
Not Shown:
Use flat washer and nyloc nut to
secure each of the 5 bolts.
Nyloc Nut
5
/
16
−18 x 1.5” (steel Cables for Mast Lock Pin & clip secured under these bolts, Figure 3-3)
3
/
8
−16 x 2”










