Product Manual

4-2 Operation MN2421
Light Tower Setup Continued
1. With the Light Mast in its’ stowed position, install or reposition the four light fixtures to
the desired placement when the tower is raised.
2. Pull the Mast Lock pin so the mast is no longer secured in the stowed position.
3. Pull the Tilt Lock pin so it is not in the way when the mast is raised.
4. Use the Tilt Winch to raise the mast to the vertical position.
Figure 4-2
Mast Rotation Lock
Jack
Tilt Lock Pin must be installed before mast is raised.
Lift Winch
Tilt Winch
Outrigger
Mast Lock Pin
5. Secure the mast in the vertical position by inserting and locking the the Tilt Lock pin,
Figure 4-2. The Tilt Lock pin must be installed and the mast secured in the
vertical position before the mast is raised.
6. Use the Lift Winch to raise the mast to the desired height. The winch is selfbraking
and will lock in place automatically.
7. To rotate the lights to the desired position, loosen the Mast Rotation Lock on the collar
of the mast, rotate the mast to the desired position and tighten the Mast Rotation Lock.
The light tower is now setup for operation.
Flood Light Operation Four flood light switches are located at the front of the generator on the Control box panel.
Flood Light Operation:
1. When the engine reaches operating speed and is operating smoothly, turn on one light
and wait one second turn on another light and wait one second etc. until the flood lights
are all on.
2. Observe the operation of each flood light and replace defective bulbs if required.
To change a bulb, refer to Section 5 of this manual.
Note: Vaporous flood lights may require 5 to 15 minutes to warm up and produce full light output.
Operating Checks:
3. Check diesel fuel level and shut off the engine and add if necessary. Check engine oil
each time fuel is added. Never allow the engine to run out of fuel or to run low of oil.